Site Preparation
Guide
Everything you need to do before delivery day to ensure a smooth, safe installation of your new building.
Checklist Complete
0 of 21 items checked off
What a Ready Site Looks Like
Visual overview of the key clearance and leveling requirements
YOUR
BUILDING
โ๏ธ
2 ft clearance
on all sides beyond footprint
๐
Level within 3"
across full footprint
๐ชจ
4โ6" gravel
compacted crushed stone base
Delivery Route
12 ft wide ร 14 ft tall clearance along entire path from road to site
Ground must
support heavy truck
Interactive Checklist
Check off each item as you complete it
Delivery Access
Our truck + trailer needs a clear path to your site.
Site Leveling
The ground where your building sits must be level.
Drainage & Water
Proper drainage prevents rot and foundation issues.
Site Clearance
Remove obstacles before delivery day.
Foundation Options
Choose the base that works best for your site
Gravel Pad
4โ6 inches of compacted crushed stone, slightly larger than the building footprint. This is our most recommended option.
Concrete Slab
A poured concrete pad sized to the building footprint. Must be fully cured before delivery.
Concrete Blocks
Solid concrete blocks or deck blocks placed at corners and every 4 ft along runners. Works on relatively flat sites.
Existing Concrete/Pavers
If you have an existing flat, solid concrete area or paver patio that is level, we can often place directly on it.